dc.description.abstractNos últimos anos, muitas empresas de construção civil têm buscado melhorar seus sistemas de Planejamento e Controle da Produção (PCP) como uma das formas de melhorar o desempenho de empreendimentos em termos de prazo e custo, além dos constantes objetivos de aumentar a qualidade e a produtividade. Um marco importante no desenvolvimento de sistemas de PCP para esse setor foi a introdução do sistema Last Planner de controle da produção, concebido com base em modelos e teorias desenvolvidos para a Engenharia Industrial, a partir de meados da década de 90. Esse sistema tem sido refinado em diversos estudos ao redor do mundo, grande parte deles baseados em uma análise qualitativa dos dados gerados. De fato, as pesquisas relacionadas à implementação de sistemas de PCP desenvolvidas no Programa de Pós-graduação em Engenharia Civil da UFRGS nos últimos anos também foram fortemente baseadas no Last Planner. O objetivo geral dessa dissertação consiste em propor contribuições para a coleta e a análise de dados que permitam avaliar o impacto de sistemas de PCP no desempenho de empreendimentos de construção civil, assim como identificar algumas dificuldades de implementação. Foi criada uma base de dados com as medidas de desempenho coletadas em empresas, em pesquisas anteriores, e também com dados inseridos em um sistema de indicadores para benchmarking de empresas do setor. Foram realizadas diversas análises, principalmente dos indicadores PPC e causas do não cumprimento das tarefas, utilizando a análise de regressão múltipla. Entre as principais conclusões, o estudo apontou formas de melhorar a coleta de dados, incluindo a utilização de mecanismos pró-ativos para evitar o acúmulo de valores faltantes e dados espúrios. Além disso, sugeriu-se a formação de um banco de dados único para cada empresa para possibilitar o melhor aproveitamento dos dados, uma vez que algumas medidas são coletadas e acabam descartadas sem uma análise aprofundada. Quanto às dificuldades de implementação do PCP, destacaram-se as falhas na análise das causas do não cumprimento dos pacotes de trabalho na etapa de curto prazo e a implementação parcial do planejamento de médio prazo, devido à desconsideração da análise sistemática de restrições.pt_BR
dc.description.abstractIn recent years, several construction companies have attempted to improve their production planning and control systems in order to improve project performance in terms of time and costs, besides increasing quality and productivity. An important reference in the development of production planning and control systems in this sector has been the introduction of the Last Planner System, conceived from models and theories developed in industrial engineering, since the mid Nineties. This system has been refined in several research studies around the world, most of them based on a qualitative data analysis. In fact, the research studies concerned with production planning and control carried out at the Postgraduate Program in Civil Engineering at UFRGS is recent years have been strongly based on the Last Planner System. The main objective of this dissertation is to make contributions for data collection and analysis for assessing the impact of production planning and control systems in the performance of construction projects, as well as identify some implementation difficulties. A database was built with some measures collected in construction projects in previous research studies, as well as with data from a performance measurement system for benchmarking in this sector. Several analyses were carried out in this data base, mostly based on two measures, the percentage of plan completed (PPC) and the causes for the non completion of work packages, using multivariate regression analysis. Among the main conclusions, this study pointed out ways of improving data collection, including the use of pro-active mechanisms for avoiding the growth of missing values and outliers. Furthermore, it suggests the construction of a single database in each company, enabling the proper use of the data available, since some of the measures are collected but are further discarded without an in-depth analysis. Regarding the difficulties in the implementation of production planning and control, some failures during the analysis of the causes for the non-completion of work packages in short term planning and the incomplete implementation of look-ahead planning, due to the ineffectiveness of constraints analysis, were pointed out.en
dc.format.mimetypeapplication/pdf
dc.language.isoporpt_BR
dc.rightsOpen Accessen
dc.subjectProduction planning and controlen
dc.subjectPlanejamento e controle da produçãopt_BR
dc.subjectIndicadores de desempenhopt_BR
dc.subjectLast planner systemen
dc.subjectConstrução civilpt_BR
dc.subjectIndicatorsen
dc.titleContribuições para a coleta e a análise de indicadores de planejamento e controle da produção na construção civilpt_BR
dc.title.alternativeContributions for data colection and analysis of indicators of production planning and control in construction en
dc.typeDissertaçãopt_BR
dc.identifier.nrb000649537pt_BR
dc.degree.grantorUniversidade Federal do Rio Grande do Sulpt_BR
dc.degree.departmentEscola de Engenhariapt_BR
dc.degree.programPrograma de Pós-Graduação em Engenharia Civilpt_BR
dc.degree.localPorto Alegre, BR-RSpt_BR
dc.degree.date2006pt_BR
dc.degree.levelmestradopt_BR


Thumbnail
   

Este item está licenciado na Creative Commons License

Mostrar registro simples