dc.description.abstractA drenagem acida de minas (DAM) gerada durante a mineração do carvão decorre em dano ambiental significativo nos ecossistemas associados à mesma. Atualmente, para resolver esta situação, sistemas ativos de tratamento, valendo-se de processos de neutralização/precipitação/sedimentação, têm sido implementados. Esses sistemas proporcionam bons resultados no tratamento da água, principalmente na correção do pH e na remoção de ferro e alumínio. No entanto, por vezes são parcialmente eficientes na remoção de manganês e sulfato. Métodos passivos de tratamento têm sido empregados como alternativa aos ativos. Destes destacam-se os banhados construídos (ou "constructed wetlands") os quais podem operar isoladamente ou associados a sistemas ativos e/ou demais sistemas passivos. Os banhados construídos, mediante mecanismos físicos e químicos controlados por meio de critérios construtivos, têm sido capazes de remover ferro, alumínio e o íon sulfato e mesmo manganês ou outros metais. Tendo-se que a DAM é um grave problema ambiental que afeta a região carbonífera do sul de Santa Catarina objetivou-se, através do presente estudo, verificar o potencial de tratamento da DAM por meio de banhados construídos enquanto etapa complementar ao processo ativo de tratamento instalado na Mina Verdinho de propriedade da empresa Carbonífera Criciúma SA. Avaliou-se o desempenho de lagoa de polimento (tratamento secundário) instalada após o tratamento ativo. Em escala piloto, observou-se o efeito do sistema construtivo (aeróbico ou anaeróbico seguido de aeróbico - misto) e do tempo de detenção (1, 10 e 20 dias) sobre parâmetros de qualidade do efluente durante o período inicial (start up) do sistema para analise da viabilidade da implantação de banhados construídos. Os parâmetros analisados foram: pH, potencial redox, oxigênio dissolvido, teor de ferro, manganês e sulfatos e demanda química de oxigênio. Os resultados demonstraram que, nas condições do experimento, o sistema mais conveniente mostrou ser a lagoa de polimento ora empregada, pois acrescentou oxigênio dissolvido e equalizou o efluente final. Em termos dos banhados construídos o sistema misto com tempo de detenção de 10 dias mostrou ser o mais adequado ao remover 21% do sulfato.pt_BR
dc.description.abstractAcid mine drainage (AMD), generated during coal mining, causes a significant environmental damage over ecosystems associated. Nowadays, in order to solve this issue, active treatment systems based on neutralization/ precipitation/ sedimentation have been implemented. These systems provide favorable results on water treatment, especially over pH adjustment and iron and aluminium removal. However, are partially effective on manganese and sulfates removal. Passive treatment systems have been used as an alternative to active treatment systems. Among them, constructed wetlands stand out operating independently or associated to active and/or other passive treatment systems. Constructed wetlands, through physical and chemical mechanisms controlled by constructive criteria, have been able to remove iron, aluminium as well as sulphate ion and sometimes manganese and even other metals. According that AMD is a serious environmental hazard that affects the south coal production region of Santa Catarina it has been the objective of the present study verify the potential treatment of AMD by constructed wetlands as a complementary step of an active treatment system installed at Verdinho Mine witch belongs to Carbonifera Criciúma SA. It has been evaluated the performance of the polishing pond (secondary treatment) installed right after an active treatment plant. At pilot scale, it has been observed the effect of the constructive system (aerobic or anaerobic followed by aerobic - composed) and the detention time (1, 10 and 20 days) over some effluent parameters during the start up period of the implemented experiment in order to analyze the viability of installing constructed wetlands. The analyzed parameters were: pH, redox potential, dissolved oxygen, concentrations of iron, manganese and sulphate and chemical oxygen demand. Results demonstrated that, under experiment conditions, the most convenient system has proven to be the polishing pond in use since it increased the dissolved oxygen concentration and equalized the effluent. In terms of constructed wetlands the composed treatment system with 10 days of detention time has shown being the most convenient since it has removed 21% of sulphate concentration. Key-words: constructed wetland, acid mine drainage (AMD), mining, coal.en
dc.format.mimetypeapplication/pdf
dc.language.isoporpt_BR
dc.rightsOpen Accessen
dc.subjectDrenagem ácida de minaspt_BR
dc.subjectCarvãopt_BR
dc.titleTratamento secundário de drenagem ácida de mina em banhados construídos e lagoa de polimentopt_BR
dc.typeDissertaçãopt_BR
dc.identifier.nrb000707120pt_BR
dc.degree.grantorUniversidade Federal do Rio Grande do Sulpt_BR
dc.degree.departmentEscola de Engenhariapt_BR
dc.degree.programPrograma de Pós-Graduação em Engenharia Minas, Metalúrgica e de Materiaispt_BR