dc.contributor.authorBataglin, Fernanda Saidellespt_BR
dc.contributor.authorViana, Daniela Dietzpt_BR
dc.contributor.authorFormoso, Carlos Torrespt_BR
dc.contributor.authorBulhões, Iamara Rossipt_BR
dc.date.accessioned2019-10-17T03:51:28Zpt_BR
dc.date.issued2018pt_BR
dc.identifier.issn1415-8876pt_BR
dc.identifier.urihttp://hdl.handle.net/10183/200751pt_BR
dc.description.abstractA gestão de sistemas pré-fabricados demanda uma intensa troca de informações entre a fábrica e a obra, de forma a sincronizar a fabricação, as operações logísticas e o processo de montagem, principalmente em ambientes engineer-to-order, no qual o nível de incerteza tende a ser alto. A literatura sugere o uso de Building Information Modeling (BIM) para facilitar o compartilhamento de informações e apoiar a tomada de decisões, assim como a aplicação de conceitos e princípios da Produção Enxuta. Particularmente em relação ao processo de montagem, o BIM 4D pode ser utilizado para simular algumas operações, apoiando o planejamento e controle da produção. O presente artigo propõe um conjunto de diretrizes para a utilização do BIM 4D e conceitos e princípios da Produção Enxuta para apoiar a gestão logística do processo de montagem de sistemas pré-fabricados em concreto do tipo engineer-to-order. Foi adotada a abordagem metodológica da Design Science Research, tendo por base um estudo empírico realizado em uma empresa que fornece estruturas pré-fabricadas de concreto. As principais contribuições do trabalho referem-se o uso de BIM 4D para padronizar as operações logísticas e para a gestão de informações relacionadas ao status do sistema.pt_BR
dc.description.abstractThe management of prefabricated building systems demands an intense exchange of information between the the plant and the construction site, in order to synchronize the production of components, logistic operations and site assembly, especially in engineer-to-order environments, in which the degree of uncertainty tends to be high. The literature suggests the use of Building Information Modeling (BIM) to facilitate the sharing of information and to support decision-making in this type of environment, as well as the application of Lean Production concepts and principles. Particularly in relation to the assembly process, 4D BIM can be used to simulate some operations, supporting production planning and control. This paper proposes a set of guidelines for using 4D BIM and Lean Production concepts and principles to support logistics management for the assembly process in engineer-to-order concrete prefabricated systems. Design Science Research was the methodological approach adopted in this investigation, which was based on an empirical study carried out in a company that delivers prefabricated concrete structures. The main contributions of this study are related to the use of BIM 4D for standardizing logistics operations, and for managing information related to system statusen
dc.format.mimetypeapplication/pdfpt_BR
dc.language.isoengpt_BR
dc.relation.ispartofAmbiente construído: revista da Associação Nacional de Tecnologia do Ambiente Construído. Porto Alegre. Vol. 18, n. 1 (jan./mar. 2018), p. 173-192.pt_BR
dc.rightsOpen Accessen
dc.subjectLogistic managementen
dc.subjectLogísticapt_BR
dc.subjectLean productionen
dc.subjectModelagem BIMpt_BR
dc.subjectEngenharia sob encomendapt_BR
dc.subjectPrefabricationen
dc.subjectProdução enxutapt_BR
dc.subjectEngineer-to-orderen
dc.titleBIM 4D aplicado à gestão logística : implementação na montagem de sistemas pré fabricados de concreto engineer to orderpt_BR
dc.title.alternative4D BIM applied to logistics management : implementation in the assembly of engineer-to-order prefabricated concrete systemsen
dc.typeArtigo de periódicopt_BR
dc.identifier.nrb001102840pt_BR
dc.type.originNacionalpt_BR